SHREE RADHIKA ENGINEERS : TIE BEAM & DUCT ERECTION AT INDIA GLYCOL LTD KASHIPUR

TIE BEAM AND DUCT ERECTION

“The tie beam was successfully erected using a Hydra, and the SS duct was installed via crane with full safety measures in place, carried out smoothly by the employees of Shree Radhika Engineers. The project was overseen by Project Engineer Mr. Sandeep Singh and Site In-charge Mr. Kapil Yadav.”

Brief Explanation:

  • Tie beam erection via Hydra: A Hydra (a mobile crane) was used to erect the tie beam, which helps stabilize the structure.
  • SS duct installation via crane: The SS (stainless steel) duct was lifted and installed using a crane, ensuring heavy materials are placed accurately.
  • Full safety: Safety measures were strictly followed to avoid accidents during the operation.
  • Smooth execution: The process went without complications, demonstrating the efficiency and skill of the team.
  • Supervision: Mr. Sandeep Singh, the Project Engineer, and Mr. Kapil Yadav, the Site In-charge, were present to oversee the entire operation, ensuring everything was done to specifications.